Healthcare

Arcispedale Sant’Anna di Cona – Ferrara

New trigeneration power plant

Areas:
  • Cogeneration

The design activities carried out involve the construction of a trigenerative island to optimize the Hospital’s current plant stock plantmatically and energetically, with consequent benefits in environmental terms as well. The trigenerative system will be placed in outdoor cabinets located near the technological hub afferent to the Ospeale. Inside it are placed the 2,678 kWe endothermic cogeneration engine, fueled by natural gas, and the 1,200 kW refrigeration absorber, as well as related auxiliaries. The recovered thermal energy will be used in the form of hot water to satisfy the thermal users of the hospital complex or, alternatively, to feed the absorption refrigeration unit for the production of cooling energy to be used again for hospital users. Similarly, electricity will be self-consumed by the hospital.

Engineering Services provided:

Final design, permitting practices, executive design and construction design

committente
customer

SIRAM

fruitore
End-User

Azienda Ospedaliero - Universitaria di Ferrara

ubicazione
location

Ferrara

periodo
period

2018 - 2019

importo
amount of works

4.000.000€