Tertiary

Sky Italy headquarters

Areas:
  • Cogenerazione

The natural gas trigeneration plant with an electrical power of 3,3 MW is installed in an urban context. The impact of the new plant required an interesting analysis to minimize the interferences on the main environmental issues: noise and emissions in the atmosphere.

Furthermore, the interconnections with the existing plants were particularly challenging, especially with the chilling plant situated on the rooftop of the main building and the flue gas pipeline.

The construction design was fully developed in 3D with detailed isometric sketches to allow the pre-fabrication of the components thus reducing the on-site installation time. This was conducted to avoid interference of the works on the telecommunications activity of the customer, always online.

Engineering Services provided:

Detailed design, construction design, technical support on construction site until tests, as-built report.

committente
customer

Bosch Energy

fruitore
End-User

SKY

periodo
period

2017-2018

importo
amount of works

€ 3.000.000