Industry

Water factory San Benedetto

Areas:
  • Cogenerazione

The project consisted in the contemporary production of electrical power, hot water, chilled water and steam, all vectors necessary for the bottling process of the factory. The plant is able to produce an electrical power of 13,2 MW and the same amount of thermal power recovered from the engine and the flue gases. The plant is inside a 3-floor custom-made building.

Engineering Services provided:

Preliminary design, definitive design, detailed design, authorisation procedures, construction management.

committente
customer

E.ON tramite EPC ALPIQ

fruitore
End-User

Stabilimento Acqua Minerale San Benedetto

ubicazione
location

Scorzè (VE)

periodo
period

2015-2016

importo
amount of works

€. 11.300.000