Industry

Klopmann Establishment

New cogeneration plant and steam generation plant upgrading

Areas:
  • Cogeneration
  • Energy efficiency
  • Renewables

The existing thermal power plant underwent energy upgrading by changing the two steam generators and constructing a cogeneration plant outside the building.

Specifically, two steam generators of the three-round smoke type, complete with external superheater, were installed, each capable of producing 22 ton/h of superheated steam at a maximum of 11.6 barg, later reduced to 5.8 barg and temperature of about 188°C.

The cogenerator has an installed capacity of 3.3 MW electric and 3.4 MW thermal.

The installed cogeneration module is housed in a special outdoor enclosure, and plant interfaces with the rest of the plant were made via pipe-rack that joins the enclosure with the existing building.

Engineering Services provided:

Permitting practices, executive design, construction management, as built

committente
customer

Soc. SACCIR

fruitore
End-User

Klopmann International S.r.l.

ubicazione
location

Frosinone (FR)

periodo
period

2018-2019

importo
amount of works

6.000.000 €

Project Gallery

COGENERA ENGINEERING FIRM

Find out the project realized by Cogenear over the years for the national industrial and tertiary sectors.